
TSMC, the world's largest contract chipmaker, raised its global chip market forecast by 50% — from $1 trillion to more than $1.5 trillion by 2030, driven by surging demand for artificial intelligence and high-performance computing.
AI and high-performance computing are expected to account for 55% of the $1.5 trillion market, equivalent to roughly $825 billion, followed by smartphones at 20% and automotive applications at 10%.
Demand for AI accelerator wafers alone is projected to increase 11-fold between 2022 and 2026.
TSMC is accelerating capacity expansion. The company plans to build nine phases of wafer fabrication plants and advanced packaging facilities in 2026.
Projected Growth Rates: Capacity for its most advanced 2nm and next-generation A16 chips is projected to grow at a compound annual rate of 70% from 2026 to 2028. CoWoS capacity — a key packaging technology widely used in AI processors including those designed by Nvidia — is forecast to grow at a compound annual rate of more than 80% from 2022 to 2027.
Arizona, USA: The first fab is already in production. Tool installation for the second fab is planned for the second half of 2026. Construction of the third fab is underway. Work on a fourth fab and the site's first advanced packaging facility is expected to begin this year. TSMC anticipates a 1.8-fold year-on-year increase in Arizona output by 2026, with yields comparable to those in Taiwan.
Japan: The first fab is in volume production for 22nm and 28nm products. Plans for the second fab have been upgraded to 3nm in response to strong demand.
Germany: The fab is currently under construction and progressing as scheduled. It plans to provide 28nm and 22nm technologies, followed by 16nm and 12nm technologies.
FAQs
CONTACT US
©2026 MobiTech Integrated Solutions. . All Rights Reserved